Locations

Commercial Solar EPC in New Hampshire

Ferrius Energy engineers, builds, and maintains commercial solar and battery storage for New Hampshire businesses, municipalities, and institutions in Eversource, Unitil, Liberty, and New Hampshire Electric Co-op territory. New Hampshire has no large state incentive program, so commercial solar here is justified mainly by self-consumption under the NEM 2.0 net metering tariff, the Section 48E federal credit, depreciation, and a local-option property tax exemption.

That makes New Hampshire an engineering-first market: the project pays back on how well the array matches the building's load, not on a state adder. Our Saugus, Massachusetts headquarters is within about an hour of the Seacoast, Nashua, and Manchester.

Last reviewed: September 2026. Net metering terms reflect PUC Order No. 27,074 (November 2024) and NH Department of Energy guidance; confirm current tariffs with your utility and the NH Department of Energy.

Net metering in New Hampshire: NEM 2.0

New Hampshire's current tariff, NEM 2.0, came out of PUC Order No. 26,029 and took effect September 1, 2017. In November 2024, in Docket DE 22-060, the PUC issued Order No. 27,074, which kept NEM 2.0 in place, allowed utilities to charge interconnection application fees from January 1, 2025, and kept (without extending) the legacy period for existing net-metered customers through December 31, 2040. A second phase of that docket is considering broader local-generation and storage compensation, so the tariff could change for future projects; systems built now are evaluated under NEM 2.0.

What matters for a commercial owner is the size split:

NEM 2.0 export credit by system size
Component credited on exportsUp to 100 kW ACOver 100 kW to 1 MW AC
Energy (default energy service rate)FullFull
TransmissionFullNone
Distribution25%None
System benefits, stranded cost, storm recoveryNoneNone

In plain terms, a large customer-generator (over 100 kW) earns roughly the default energy supply rate on every exported kWh, while every kWh consumed on site avoids the full retail rate. That gap is why we size New Hampshire commercial arrays to the daytime load curve, and why the 100 kW line is a real design decision: a system just under 100 kW AC can outperform a larger one on a per-dollar basis at some sites. The general cap for net metering is 1 MW AC.

Group net metering and municipal hosts

A group host can share credits with members in the same utility territory, provided total host and member load equals or exceeds annual generation and a group agreement is in place. A large generator that does not use at least 20% of its output on site must register as a group. Hosts register with the NH Department of Energy and their utility and report annually.

Under HB 315 (signed August 26, 2021), a municipal group host can net meter projects between 1 and 5 MW AC if every member is a political subdivision (towns, school districts, and similar public bodies) in the same utility territory. For a town that wants to cover schools, water treatment, and town buildings from a closed landfill or gravel pit, that 5 MW pathway is the most useful structure in the state.

Utilities

Four utilities, four sets of details

New Hampshire's regulated net metering framework applies across its distribution utilities, but rate classes, demand charges, interconnection queues, and hosting capacity differ, and those differences change the model.

Eversource NH

The largest utility, covering most of the state including Manchester, Nashua outskirts, Concord, and much of the North Country. Demand-billed C&I rates make storage worth modeling alongside solar.

Unitil

Serves the Seacoast and Concord-area communities. Coastal commercial and hospitality sites need wind-exposure structural design.

Liberty

Serves Salem, Lebanon, and other communities. Its southern territory borders Massachusetts, where many owners run facilities on both sides of the line.

NH Electric Co-op

A member-owned cooperative serving many rural communities. Co-op members should confirm the co-op's own net metering and interconnection terms, which we check at feasibility.

State incentives: the C&I rebate and the Renewable Energy Fund

New Hampshire's Commercial & Industrial Solar Incentive Program is funded by the state Renewable Energy Fund and administered by the NH Department of Energy (the program was set up by the PUC, whose Order No. 26,336 of March 6, 2020 governs its current terms). The program pays $0.20 per watt (the lower of AC or DC) for new solar electric facilities on non-residential buildings with commercial meters, capped at the lesser of 25% of project cost or $10,000. Expansions of existing systems are not eligible.

At $10,000 maximum, the rebate is a modest contribution to a commercial project, and the Renewable Energy Fund's budget depends on alternative compliance payments that fluctuate year to year. Historically the program has paused when funds ran out (the older $0.40/W version closed in 2018). Confirm current availability with the NH Department of Energy before counting it in a model.

No state tax credit. New Hampshire has no state solar tax credit. The meaningful incentives for a commercial owner are federal (Section 48E and depreciation) and local (property tax).

Property tax: the local-option exemption

RSA 72:61 through 72:72 let each city or town adopt a property tax exemption for solar energy systems, by vote of its legislative body. The exemption is local option, so whether it exists, and how much it covers, depends on the municipality. For municipalities adopting on or after January 1, 2020, the statutory definition of a solar energy system covers systems that produce electricity for a building, including photovoltaics, inverters, and storage. Towns that adopted before 2020 use an older definition that covers PV systems providing electricity for a building but does not mention storage.

That detail matters for batteries: in a town with a pre-2020 exemption, storage may not be covered unless the town re-adopts. We confirm the local exemption and its adoption date with the assessor during feasibility, because property tax on a commercial array otherwise runs for the life of the system.

Delivery

Interconnection, siting, and sectors

Interconnection. Applications go to the serving utility under the PUC's Puc 900 net metering and interconnection rules. Since January 1, 2025, utilities may charge application fees. Systems between 100 kW and 1 MW can hit study requirements on rural feeders with limited hosting capacity, so we request feeder information early and design to it. The general path to permission to operate (PTO) is covered in our New England interconnection guide.

Siting and climate. Snow load and wind drive structural design across the state, and snow shedding off tilted modules needs to be planned around roof drains, walkways, and parking. Ground-mount projects on municipal land, closed landfills, and gravel pits fit the 5 MW municipal host pathway well.

Sectors. Manufacturing in the Merrimack Valley and southern tier, distribution warehouses along I-93 and Route 101, ski and hospitality properties, hospitals, colleges, and municipal facilities are the natural fits. Related pages: manufacturing, warehouses, hotels and hospitality, and schools.

Federal credit. Because the state layer is thin, the federal Section 48E investment credit carries most of the incentive value: a 6% base, or 30% for projects under 1 MW AC or that meet prevailing wage and apprenticeship requirements. Under the One Big Beautiful Bill Act (enacted July 4, 2025), solar facilities that began construction on or before July 4, 2026 are not subject to the 2027 placed-in-service deadline (subject to continuity rules). Facilities beginning construction after July 4, 2026 must be placed in service by December 31, 2027. Owners also take 5-year MACRS, and 100% bonus depreciation was made permanent in 2025. See our federal ITC guide.

Questions

Frequently asked questions

Does commercial solar pay off in New Hampshire without a state incentive?

It can, when the array is sized to on-site daytime load. Self-consumed kWh avoid the full retail rate, while exports from systems over 100 kW earn roughly the default energy rate. Combined with the Section 48E credit, depreciation, and a local property tax exemption, a well-sized system can work. We model it from your interval data.

What is the size limit for net metering in New Hampshire?

The general limit is 1 MW AC. Municipal group hosts whose members are all political subdivisions in the same utility territory can net meter projects up to 5 MW AC under HB 315 (2021).

How are exports credited for a large commercial system?

Under NEM 2.0, systems over 100 kW to 1 MW AC receive credit for exported energy at the utility's default energy service rate, with no transmission, distribution, or system benefits credit. Systems up to 100 kW also receive full transmission and 25% distribution credit.

Is the New Hampshire C&I solar rebate still available?

The NH Department of Energy's Commercial and Industrial Solar Incentive Program pays $0.20 per watt, capped at the lesser of 25% of project cost or $10,000, subject to Renewable Energy Fund availability. Confirm current status with the Department before relying on it.

Is commercial solar exempt from property tax in New Hampshire?

Only where the municipality has adopted the local-option exemption under RSA 72:61 to 72:72. Towns adopting on or after January 1, 2020 use a definition that includes inverters and storage. Check with the local assessor.

Sources

  • Community Power Coalition of NH, Statement on PUC Ruling in Net Metering Docket (Order No. 27,074, DE 22-060). communitypowernh.gov
  • NH Department of Energy, Net Metering and Group Net Metering Overview. energy.nh.gov
  • NH Department of Energy, Commercial & Industrial Solar Incentive Program. energy.nh.gov
  • NH Department of Energy, Financial Incentives for Commercial Sustainable Energy in NH (2018). energy.nh.gov
  • NH RSA 72:61, Definitions (solar energy systems). gencourt.state.nh.us
  • Rath, Young and Pignatelli, New Hampshire Raises Size Limit for Municipal Solar Projects to 5 Megawatts. rathlaw.com
  • Primmer Piper Eggleston & Cramer, New Hampshire Net Metering Update (Order No. 26,029). primmer.com
  • NH General Court, Puc 900 Net Metering Rules. gc.nh.gov